Construction Part 4: Concrete Poured in Early Morning Darkness

The first section of the new building’s concrete floor was poured on Friday, September 30th. Work began well before dawn, around 3:00 a.m.  A concrete pumping truck directed the wet concrete through a tube suspended from high above the prepared floor area.  As the concrete was poured, teams of workers quickly smoothed and leveled the surface of the new floor.  The second half of the area will be poured later this week.